What “Best” Actually Means (Not Just Cheapest)
- Design integration: Temporary works, rebar detailing, pour breaks, and build sequence optimised together—before site.
- Programme certainty: Crane/pump logistics, pour calendars, cube testing, and strike cycles that keep follow-on trades moving.
- Finish quality: Tight formwork, minimal blowholes/honeycombing, edges true to line and level—so you don’t pay for plaster to fix concrete.
- Compliance by design: QA/QC checklists, ITPs, cover records, cube results, and as-built surveys ready for Building Control and lenders.
- Safety & access: Lift core/stair sequencing, exclusion zones, and material hoists planned for live urban sites.
RC Frame Scope for Residential Blocks (What to Expect)
- Foundations: Raft, strip, or piles with caps/ground beams; earthing and service penetrations coordinated.
- Vertical elements: Shear/core walls, columns, lift/stair cores, basement retaining walls with water-resisting concrete where needed.
- Horizontal elements: Slabs (flat slab, beam & slab, or PT comparison), balconies/thermal breaks, upstands, parapets, and upturn beams.
- Ancillaries: Cast-in MEP sleeves/boxes, kicker details, water bars, cast-in channels, edge protection sockets.
- Finishes: Power-trowelled slabs (where specified), formed openings to millimetre tolerance.
Pre-Construction: The Work That Saves You Months
- Buildability review: Column grid rationalisation, wall alignment, repetitive rebar cages, and standard shutter modules.
- Temporary works strategy: Core climbing/strike cycles, back-propping plans, and pour heights matched to crane capacity.
- MEP coordination: Clash-free sleeves and box-outs—planned into rebar drawings so nothing gets drilled after.
- Programme model: Pour-by-pour calendar, cube test schedule, and follow-on trade handovers (masonry, SFS, MEP first fix).
- Method statements & ITPs: Agreed sign-off gates—rebar, formwork, pre-pour, post-pour—so payment follows progress.
On-Site Sequencing That Works
- Foundations → cores → columns/walls → slabs (repeat by level).
- Early core/stairs to create safe vertical access.
- Edge protection fixed to casting sockets—keeps façade trades happy later.
- Concrete logistics: Pump location, truck cycle time, and cold-joint prevention planned each pour.
- Curing discipline: Membranes/wet cure to lock in strength and reduce shrinkage cracking.
Quality You Can See (and Bill For)
- Crisp arrises, consistent tie hole lines, and true soffits—so ceilings don’t need over-skim.
- Cover verified with spacers and checks—protects against corrosion.
- Cubes and records aligned to programme—no mystery delays at strike.
- As-builts & survey each level—façade rails and partitions land exactly where they should.
Typical Risks—and How the Best Contractors Prevent Them
- Honeycombing/grout loss: Tight shutters, joint taping, and correct vibration technique.
- Rebar congestion: Early rebar detailing and lap planning—especially at columns/wall intersections.
- Sleeve/MEP clashes: Confirmed against rebar drawings; cast-in, not drilled-in.
- Slow cycle times: Standardised formwork, clear labour gangs, and pour windows locked to weather and crane schedules.
- Payment disputes: Transparent ITPs, cube logs, delivery tickets, and level handover sheets.
Design + Build vs Build-Only
- Design + Build (D&B): One team handles engineering and construction—fewer interfaces, faster revisions, and cleaner risk profile.
- Build-Only: Fine with finalised drawings, but you carry coordination risk and change latency.
For residential blocks, D&B often shaves weeks off the programme and reduces claims noise.
What a Strong Proposal Should Include
- Detailed BOQ and drawing list.
- Pour sequence and crane/pump plan per level.
- Temporary works concept and back-propping durations.
- Concrete specification: strength classes, exposure classes, admixtures, water-resisting notes for basements.
- ITPs & method statements: rebar, formwork, placement, curing, striking.
- Evidence: recent residential block case studies, supervisors’ CVs, cube results, and H&S stats
FAQs (Clients Ask These Every Time)
How fast can you cycle floors?
With standardised shutters and good access, 5–7 working days per level is realistic for mid-rise cores and slabs (design dependent).
Do we need post-tensioning (PT)?
Not always. We’ll value-engineer PT vs traditional to compare slab depth, rebar tonnage, vibration performance, and programme impact.
Can you take over a part-built frame?
Yes—after a structural review, rebar audit, cube history check, and temporary works verification.
Why Choose Us for RC Frames on Residential Blocks
- Engineering-led: In-house structural team optimises grids, laps, and pour breaks before mobilising.
- Urban specialists: Tight sites, live neighbours, and logistics constraints are our daily reality.
- Evidence-based QA: Every pour signed off with photos, checklists, and cube/cure records ready for Building Control.
- End-to-end: Foundations, basements, cores, slabs, stairs—and coordination for façade/SFS follow-on.
Next Steps
- Send drawings (architectural + structural) and your target programme.
- We’ll return a buildability review, costed programme, and risk register within your tender window.
Call to Action
- Book a site review this week (foundations/core strategy + programme).
- Request a tender pack with BOQ, pour sequence, and method statements.
- Ask for references from recent London residential blocks.