Why lateral supports (tie-ins) matter A free-standing tower crane quickly reaches its stability limit as height and wind exposure increase. At set building levels, we brace the mast back to the permanent structure via engineered tie-ins so overturning and sway are controlled under storm wind and out-of-service conditions. The project document shows tie-in levels at […]

