Introduction At Level 71 of The Landmark Tower in Abu Dhabi, the stainless-steel louver system demanded precise engineering to perform safely at extreme wind pressures. Aluminium & Light Industries Co. (Alico) carried out detailed structural calculations to verify framing adequacy, connection strength, and overall serviceability under critical load combinations Design Criteria and Standards Design Objective […]
Tag Archives: STAAD Pro
The challenge Mid-tower, the original scheme relied on a 400 mm transfer slab with column lines punching through a constrained core. That approach was heavy, costly to prop, and difficult to build without programme-breaking deflection control. I proposed a strategic change: replace the column forest with blade walls and engineer a dedicated support system so […]