THE 15 PHASES OF
BUILDING CONSTRUCTION SERVICES
PHASE 1 : PRELIMINARIES
- Removal of Existing Structures (if any )Temporary Services (Electricity, Water, etc.)
- Testing as Specified (Work, Material, etc.)
- Shop Drawings (MEP, etc.)
- As-Built Drawings
- Site Clearing and Cleanup
PHASE 2 : EXCAVATION & SUBSTRUCTURE WORK
- Excavation
- Back Filling
- Blinding
- Reinforced Concrete
- Ground Slab Concrete
- Engineered Brick/Block
- Lower and Upper Tie Beams
- Services: Water/Electric/Plumbing
PHASE 3 : SUPERSTRUCTURE WORK
- Walls & Columns
- Beams
- Slabs & Floors
- Stairs
- Non-structural Elements
- Others
PHASE 4 : BLOCKS WORK
- Bricks
- 10 cm Solid Blocks
- 10 cm light weight Blocks
- 15 cm Hollow Blocks
- 20 cm Hollow Blocks
- Others
PHASE 5 : WATERPROOFING WORK
- Foundation
- Bathrooms, Toilets, and Kitchens
- Roofs
- Skirting at Roof Edges
- Ground DPM/DPC
- Others
PHASE 6 : FINISHING WORK
- Flooring
- Skirting
- Paint
PHASE 7 : JOINERY & IRONMONGERY WORK
- Kitchen Cabinets (Timber) – Wall Units
- Kitchen Cabinets (Timber) – Base Units and Countertop
- Stairs handrail
- Doors & Closets
- Others
PHASE 8 : ALUMINUM & GLASS WORK
- Windows
- Door & Bi Folds
- Cladding
- Others
PHASE 9 : ELECTRICAL WORK
- Chasing and Conduits
- Wiring
- Switches & Sockets
- Distribution Boards
- Fire Fighting and Alarm System
- Telephone and Intercom Systems
- T V Systems
- Exhaust Fans
- Water Heaters
- Service Connection Fees (Electricity)
- Others
PHASE 10 : A C WORK / HEATER
- Drain and Gas Piping
- Isolators
- Radiators
- AC Units
- Warranties
- Civil Works
- Others
PHASE : 11 SANITARY WORK
- WATER SUPPLY
- External Pipes & Fittings
- Internal Pipes & Fittings
- Mixers and Accessories for Bathrooms and Toilets
- Water Pumps
- Water Tanks
- Service Connection Fees (Water)
- DRAIN
- External Pipes & Fittings
- Internal Pipes & Fittings
- Gully Traps & Manholes
- Service Connection Fees (Drainage)
PHASE 12 : EXTERNAL WORK
- Footpaths and Corridors
- Cars Path
- External Landscape (Hard and Soft)
- Cars Sheds
- External Boundary Wall
- Gates
- Gates with remote control
- Garage door with remote control
- Others
PHASE13 : SWIMMING POOL
- Swimming Pool
PHASE 14 : DECORATIVE GYPSUM WORK
- Gypsum board false ceiling
- Gypsum tiles
- Coving
PHASE 15 : CIVIL DEFENCE
- Cylinders (CO2) + powder
- Smoke Detector
- CO2 Detector